Construction of the Northeast Throughway (NET) Entuziastov Avenue – Moscow Ring Road (MRR) Segment was launched in February 2016 and completed in September 2018.
In total, Mostotrest built 11.8 km of roads, including six flyovers with a total length of 3.7 km. As part of the project, the longest, 2.5 km flyover in Moscow (Moscow Railroad Plyuschevo Station to Perovskaya Street NET exit), and the NET Perovskaya Street exit were built.