Parameters:
- Cable-stayed bridge with a total length of 2,570m and a total width of 24m.
Challenge:
- The pylons are made of metal, which enabled construction to be significantly speeded up;
- The company used a tracked crane with a capacity of 400 tons to construct the 130m pylons, which allowed expenses to be on the overall construction cost.